Stucco removed and re-done
Band is formed with one by four on bottom and
one by four at top, except where quarry tiles are set. Metal lath is nailed up for assurance of a good bond.
Scratch coat put on and scarified.
One by eights are used for forms and screwed to bottom form. Scratch coat is wet with a hose before pouring mortar to assure a good bond.
Forms removed. Finish coat will angle down from tiles for a chamfer, allowing good water runoff. Loose and spalling areas are chipped off and filled in on the concrete steps. Here a bonding coat is applied with flex-con in the mortar. Surface is left rough.
 Quarry tiles are stuck down with the same mixture. Color finish applied grouting the tiles at the same time.
Inlay is filled in first, then taped off before applying the finish on the steps. Other steps on the house are done the same way. Loose concrete removed and filled with bonding mortar. Then a bonding coat and a finish coat.
Finish color is "trabuco", like the steps out back. Columns showing inlays and cap. Top is rounded for water to run off.