Finn Castle circa 1819
Delta, Pennsylvania

The main house was built between 1819 and 1830. The addition was built in 1850. Follow this link for about the historic Finn Castle here:..

Flashing was put on backwards.

Flashing was put on backwards on the addition.

backwards flashing

Top angle was made to go into the wall. In this case, the top creates a funnel deflecting water into the wall. This backwards flashing has created a lot of repair work for us.

where the roof of the addition ties in.

Finished wall where the roof of the addition ties in.

The 1850 slate roof.

The 1850 slate roof was covered with 2" styrofoam and a chicken ramp. We didn't break a single slate.

copper step flashing under the roof slates.

Someone tucked copper step flashing under the roof slates.

Our new counter flashing

Our new counter flashing.

Loose mortar was removed including loose mortar in between the stones

Loose mortar was removed including loose mortar in between the stones. This allowed us to pack super mortar in between the stones.

This should last longer than 200 years this time.

Finished wall. This should last longer than 200 years this time.

Flashing was cut and formed for the arched door.

Flashing was cut and formed for the arched door.

necessary to flash over the door.

Porch roof was removed making it necessary to flash over the door. I want somebody to tell me how this was made without power tools.

Finished wall in Delta, Pennsylvania

Finished wall.

Block joints were scored.

Block joints were scored using a level and a speed square. You may have seen this before on my site.

Baby feet in the mortar

Baby feet in the mortar.

Finished wall in Takoma Park, Maryland.

The outside corners were badly deteriorated apparently from downspouts stopped up over the years.

ylandPutting on the finish in Takoma Park, Mar.

Deserving old house has a major repair, preserving history.

Finished wall

Finished.